City of London and Southwark Subway Railway
1884 and 1887 Incorporated to build an underground railway with two separate tunnels for 'up' and 'down' traffic and passing under the Thames.
1889 Consulting Engineer is John Fowler. Engineer is J. H. Greathead.[1]