Meldon Reservoir
Near Okehampton in Devon
The dam stands 55 metres (180 ft) tall and is 200 metres (660 ft) wide.
1970 Construction started
1972 Opened
1988 A 500 kw turbine generator. Engineering on the project was MRM Partnership of Bristol and it was installed by Westbury-based Energy and Waste Systems.[1]
See Also
Sources of Information
- ↑ Western Daily Press - Saturday 21 May 1988