Tiverton and North Devon Railway
1865 Incorporated to construct a line from Tiverton to Morebath. Length 8.25 miles.
1875 Incorporated to construct a line from Morebath to Bolham. length 6.5 miles.
1868 Engineer is Charles Richardson.[1]
1884 Line opened