Heysham Nuclear Power Station: Difference between revisions
No edit summary |
No edit summary |
||
Line 10: | Line 10: | ||
==Sources of Information== | ==Sources of Information== | ||
<references/> | <references/> | ||
{{DEFAULTSORT: Heysham}} | {{DEFAULTSORT: Heysham}} | ||
[[Category: Town - Heysham]] | [[Category: Town - Heysham]] | ||
[[Category: Electricity | [[Category: Electricity Power Stations]] |
Latest revision as of 10:26, 28 March 2025
Site in Lancashire of 2 nuclear power plants
1967 Work started on the first Heysham nuclear power station. Two Advanced Gas Cooled Reactors. Two GEC Turbine Generators rated at 660 MWe[1]
1980 Work started on the second Heysham nuclear power station. Two Advanced Gas Cooled Reactors. Two NEI-Parsons Turbine Generators rated at 660 MWe[2]