Lynemouth Power Station: Difference between revisions

From Graces Guide
PaulF (talk | contribs)
No edit summary
No edit summary
 
(One intermediate revision by one other user not shown)
Line 1: Line 1:
Lynemouth was the first power station to start the process from burning coal to biomass in the UK, and is one of the largest such in Europe.
1968 Alcan had applied for planning permission for the construction of a new aluminium smelter in Northumberland at Lynemouth. Later that year, Alcan was granted the permission and site preparation would soon begin. To meet the electric demand of the new smelter, a power station would also be needed and therefore, Lynemouth Power Station was constructed  800 m (2,600 ft) from the aluminium smelter. Buildings designed by [[Yorke, Rosenberg and Mardall]] with engineering consultation from [[Engineering and Power Consultants]]. The power station was constructed by [[Tarmac Construction]] and the smelter by [[M. J. Gleeson Group|M. J. Gleeson Co]]. Both the power station and smelter were brought into operation in March 1972.


1968 Alcan had applied for planning permission for the construction of a new aluminium smelter in Northumberland at Lynemouth. Later that year, Alcan was granted the permission and site preparation would soon begin. To meet the electric demand of the new smelter, a power station would also be needed and therefore, Lynemouth Power Station was constructed  800 m (2,600 ft) from the aluminium smelter. Buildings designed by [[Yorke, Rosenberg and Mardall]] with engineering consultation from [[Engineering and Power Consultants]]. The power station was constructed by [[Tarmac Construction]] and the smelter by [[M. J. Gleeson Group|M. J. Gleeson Co]]. Both the power station and smelter were brought into operation in March 1972.
2018 Lynemouth converted from burning coal to biomass, one of the first in the UK, and is one of the largest such in Europe.


== See Also ==
== See Also ==
Line 12: Line 12:
{{DEFAULTSORT: }}  
{{DEFAULTSORT: }}  
[[Category: Town - Ashington]]
[[Category: Town - Ashington]]
[[Category: Electricity Generation & Supply‏‎ ]]
[[Category: Electricity Power Stations]]

Latest revision as of 10:12, 28 March 2025

1968 Alcan had applied for planning permission for the construction of a new aluminium smelter in Northumberland at Lynemouth. Later that year, Alcan was granted the permission and site preparation would soon begin. To meet the electric demand of the new smelter, a power station would also be needed and therefore, Lynemouth Power Station was constructed 800 m (2,600 ft) from the aluminium smelter. Buildings designed by Yorke, Rosenberg and Mardall with engineering consultation from Engineering and Power Consultants. The power station was constructed by Tarmac Construction and the smelter by M. J. Gleeson Co. Both the power station and smelter were brought into operation in March 1972.

2018 Lynemouth converted from burning coal to biomass, one of the first in the UK, and is one of the largest such in Europe.