Kington and Eardisley Railway: Difference between revisions
Created page with " == See Also == <what-links-here/> == Sources of Information == <references/> {{DEFAULTSORT: }} Category: Railway Companies" |
No edit summary |
||
(One intermediate revision by the same user not shown) | |||
Line 1: | Line 1: | ||
1862 Incorporated to build a line from the Leominster and Kington to the Hereford, Hay and Brecon at Eardisley. Length is 13 miles. | |||
1868 Engineer is [[Thomas David Roberts]].<ref>[[1868 Bradshaw's Railway Manual]]</ref> | |||
1889 Engineer is [[George Wells Owen]].<ref>[[1889 Bradshaw's Railway Manual]]</ref> | |||
== See Also == | == See Also == |
Latest revision as of 16:48, 3 November 2023
1862 Incorporated to build a line from the Leominster and Kington to the Hereford, Hay and Brecon at Eardisley. Length is 13 miles.
1868 Engineer is Thomas David Roberts.[1]
1889 Engineer is George Wells Owen.[2]