A large substation located next to the site of [[Staythorpe Power Stations]]; there is also a monument nearby.<ref>[https://en.wikipedia.org/wiki/Staythorpe_Power_Station Wikipedia]</ref> | A large substation located next to the site of [[Staythorpe Power Stations]]; there is also a monument nearby.<ref>[https://en.wikipedia.org/wiki/Staythorpe_Power_Station Wikipedia]</ref> | ||
1950 [[Staythorpe Power Stations|Staythorpe Power Station]] was linked with the [[East Midlands Area Board]] | 1950 [[Staythorpe Power Stations|Staythorpe Power Station]] was linked with the [[East Midlands Electricity Board|East Midlands Area Board's]] 66kV system by two double-circuit overhead lines, via Willoughby and East Kirby respectively. Two 60MVA transformers provide interconnection between the 66kV busbars and the 132kV grid system by one double-circuit line to Corby; lines to Grantham and Neepsend are under construction in 1950, the latter line being designed for future operation at 275kV /300kV, as part of the proposed "super" grid.<ref>[[The Engineer 1951/01/05]]</ref> | ||
system by two double-circuit overhead lines, via Willoughby and East Kirby respectively. Two 60MVA transformers | |||
provide interconnection between the 66kV busbars and the 132kV grid system by one double-circuit line to Corby; lines to Grantham and Neepsend are under construction in 1950, the latter line being designed for future operation at 275kV /300kV, as part of the proposed "super" grid.<ref>The Engineer 1951/01/05</ref> | |||
== See Also == | == See Also == | ||
Line 17: | Line 14: | ||
{{DEFAULTSORT: }} | {{DEFAULTSORT: }} | ||
[[Category: Town - Staythorpe]] | [[Category: Town - Staythorpe]] | ||
[[Category: Electricity | [[Category: Electricity Power Stations]] |
Latest revision as of 11:40, 28 March 2025


A large substation located next to the site of Staythorpe Power Stations; there is also a monument nearby.[1]
1950 Staythorpe Power Station was linked with the East Midlands Area Board's 66kV system by two double-circuit overhead lines, via Willoughby and East Kirby respectively. Two 60MVA transformers provide interconnection between the 66kV busbars and the 132kV grid system by one double-circuit line to Corby; lines to Grantham and Neepsend are under construction in 1950, the latter line being designed for future operation at 275kV /300kV, as part of the proposed "super" grid.[2]