1905 Construction of the power station. Contractors included [[GEC]], who made the dynamos and supplied the engines and dynamos, and [[John Spencer]], who provided the pipework, boiler feed pumps, feed heater and economiser<ref>[[The Engineer 1905/10/13]]</ref> | 1905 Construction of the power station for Urban District Council of Handsworth. Contractors included [[GEC]], who made the dynamos and supplied the engines and dynamos, and [[John Spencer]], who provided the pipework, boiler feed pumps, feed heater and economiser<ref>[[The Engineer 1905/10/13]]</ref> | ||
== See Also == | == See Also == | ||
Line 6: | Line 6: | ||
== Sources of Information == | == Sources of Information == | ||
<references/> | <references/> | ||
{{DEFAULTSORT: }} | {{DEFAULTSORT: }} | ||
[[Category: Town - Birmingham]] | [[Category: Town - Birmingham]] | ||
[[Category: Electricity | [[Category: Electricity Power Stations]] |
Latest revision as of 10:25, 28 March 2025
1905 Construction of the power station for Urban District Council of Handsworth. Contractors included GEC, who made the dynamos and supplied the engines and dynamos, and John Spencer, who provided the pipework, boiler feed pumps, feed heater and economiser[1]