Metropolitan-Vickers: Electricity Meters: Difference between revisions
No edit summary |
No edit summary |
||
(2 intermediate revisions by 2 users not shown) | |||
Line 4: | Line 4: | ||
[[Image:Im100323-MetroVick1.jpg|thumb| Exhibit at the [[Museu de Electricidade, Madeira]]. ]] | [[Image:Im100323-MetroVick1.jpg|thumb| Exhibit at the [[Museu de Electricidade, Madeira]]. ]] | ||
[[Image:Im100323-MetroVick2.jpg|thumb| Exhibit at the [[Museu de Electricidade, Madeira]]. ]] | [[Image:Im100323-MetroVick2.jpg|thumb| Exhibit at the [[Museu de Electricidade, Madeira]]. ]] | ||
[[Image:Im2015Aus10-metVick.jpg|thumb| Type "N" Polyphase Watt- | [[Image:Im2015Aus10-metVick.jpg|thumb| Type "N" Polyphase Watt-hour Meter]] | ||
''Note: This is a sub-section of [[Metropolitan-Vickers]] | ''Note: This is a sub-section of [[Metropolitan-Vickers]] | ||
1919 A meter engineering laboratory was set up. | |||
1924 Designed a prepayment mechanism, which became the foundation of a considerable business. | |||
1930s [[AEI]] acquired [[Park Royal Engineering Works]], from which M-V began to manufacture a line of miniature instruments. | |||
== See Also == | == See Also == |
Latest revision as of 17:57, 7 February 2019






Note: This is a sub-section of Metropolitan-Vickers
1919 A meter engineering laboratory was set up.
1924 Designed a prepayment mechanism, which became the foundation of a considerable business.
1930s AEI acquired Park Royal Engineering Works, from which M-V began to manufacture a line of miniature instruments.