Metropolitan-Vickers: Electricity Meters: Difference between revisions
No edit summary |
No edit summary |
||
Line 7: | Line 7: | ||
''Note: This is a sub-section of [[Metropolitan-Vickers]] | ''Note: This is a sub-section of [[Metropolitan-Vickers]] | ||
1919 A meter engineering laboratory was set up. | |||
1924 Designed a prepayment mechanism, which became the foundation of a considerable business. | |||
== See Also == | == See Also == |
Revision as of 11:14, 19 December 2018






Note: This is a sub-section of Metropolitan-Vickers
1919 A meter engineering laboratory was set up.
1924 Designed a prepayment mechanism, which became the foundation of a considerable business.