1996 British Energy was formed to operate eight UK nuclear power stations (AGRs and one PWR) transferred from [[Nuclear Electric]] and [[Scottish Nuclear]]; the company subsequently acquired one coal-fired power station. | 1996 British Energy was formed to operate eight UK nuclear power stations (AGRs and one PWR) transferred from [[Nuclear Electric]] and [[Scottish Nuclear]]; the company subsequently acquired one coal-fired power station. | ||
2009 [[EDF Energy]] took control of [[British Energy]], buying share capital from the government. This made EDF Energy one of the UK's largest generators. At the same time, EDF established [[NNB Generation Co|NNB GenCo]] as a separate subsidiary for the construction of additional new nuclear plants. [[Centrica]] purchased a 20% stake in British Energy from EDF, and also had an option to acquire 20% of NNB GenCo. | |||
2009 the British Energy subsidiary group was structured accordingly: | |||
* British Energy Group plc: holding company, a wholly owned subsidiary of EDF S.A. | * British Energy Group plc: holding company, a wholly owned subsidiary of EDF S.A. | ||
Line 12: | Line 12: | ||
* British Energy Renewables Ltd: participated in a small number of renewable power projects. | * British Energy Renewables Ltd: participated in a small number of renewable power projects. | ||
* Lewis Wind Power Ltd: joint venture with AMEC to develop a proposed wind farm on the island of Lewis. | * Lewis Wind Power Ltd: joint venture with AMEC to develop a proposed wind farm on the island of Lewis. | ||
From 1 July 2010 the rebranding of British Energy locations and communications to [[EDF Energy]] commenced as part of its incorporation into the parent group, following around 17 months of dual branding. This was concluded with the renaming of the operating company from [[British Energy Generation]] to [[EDF Energy Nuclear Generation]] on 1 July 2011. | |||
== See Also == | == See Also == |
Revision as of 10:17, 22 May 2020
British Energy was the UK's largest electricity generation company by volume, before being taken over by EDF in 2009.
1996 British Energy was formed to operate eight UK nuclear power stations (AGRs and one PWR) transferred from Nuclear Electric and Scottish Nuclear; the company subsequently acquired one coal-fired power station.
2009 EDF Energy took control of British Energy, buying share capital from the government. This made EDF Energy one of the UK's largest generators. At the same time, EDF established NNB GenCo as a separate subsidiary for the construction of additional new nuclear plants. Centrica purchased a 20% stake in British Energy from EDF, and also had an option to acquire 20% of NNB GenCo.
2009 the British Energy subsidiary group was structured accordingly:
- British Energy Group plc: holding company, a wholly owned subsidiary of EDF S.A.
- British Energy Generation Ltd: dominant subsidiary; owned and ran the large power stations, was licensed to operate nuclear power stations.
- District Energy Ltd: owned four modern 10 MWe natural gas fuelled power plants.
- British Energy Renewables Ltd: participated in a small number of renewable power projects.
- Lewis Wind Power Ltd: joint venture with AMEC to develop a proposed wind farm on the island of Lewis.
From 1 July 2010 the rebranding of British Energy locations and communications to EDF Energy commenced as part of its incorporation into the parent group, following around 17 months of dual branding. This was concluded with the renaming of the operating company from British Energy Generation to EDF Energy Nuclear Generation on 1 July 2011.