Ericht Hydro-Electric Scheme: Difference between revisions
No edit summary |
No edit summary |
||
Line 1: | Line 1: | ||
A hydro-electric scheme constructed initially for the [[Grampian Electricity Supply Co]]. | A hydro-electric scheme constructed initially for the [[Grampian Electricity Supply Co]]. | ||
1930 A dam and diversion works were built at the outlet of Loch Ericht to provide a water supply to the new Rannoch hydro-power station; the [[Ericht Hydro-Electric Scheme]] was brought into operation at the end of 1930. | 1930 A dam and diversion works were built at the outlet of Loch Ericht to provide a water supply to the new Rannoch hydro-power station; the [[Ericht Hydro-Electric Scheme]] was brought into operation at the end of 1930.<ref>The Engineer 1931/08/07</ref> | ||
==See Also== | ==See Also== |
Revision as of 15:00, 21 October 2020
A hydro-electric scheme constructed initially for the Grampian Electricity Supply Co.
1930 A dam and diversion works were built at the outlet of Loch Ericht to provide a water supply to the new Rannoch hydro-power station; the Ericht Hydro-Electric Scheme was brought into operation at the end of 1930.[1]
See Also
Sources of Information
- ↑ The Engineer 1931/08/07