A hydro-electric scheme constructed initially for the [[Grampian Electricity Supply Co]]. | A hydro-electric scheme constructed initially for the [[Grampian Electricity Supply Co]]. | ||
Revision as of 15:03, 21 October 2020




A hydro-electric scheme constructed initially for the Grampian Electricity Supply Co.
1930 A dam and diversion works were built at the outlet of Loch Ericht to provide a water supply to the new Rannoch hydro-power station; the Ericht Hydro-Electric Scheme was brought into operation at the end of 1930.[1]