South Lancashire Electric Traction and Power Co: Difference between revisions
Created page with " ==See Also== <what-links-here/> ==Sources of Information== <references/> {{DEFAULTSORT: }} Category: Town - " |
No edit summary |
||
Line 1: | Line 1: | ||
[[South Lancashire Tramways Co]] had difficulty raising capital and at the end of November 1900 its shares were acquired by the South Lancashire Electric Traction and Power Company. It also acquired the shares of the [[Lancashire Light Railways Co]] and the [[South Lancashire Electric Supply Co]]. Construction began in late 1901 and in October 1902 the first section from Lowton through Leigh and Atherton to Four Lane Ends at Over Hulton opened. | |||
Atherton became the centre of the system and the tram sheds, power station and offices were built on the north side of Leigh Road at Howe Bridge (grid reference SD 6624 0203) | |||
==See Also== | ==See Also== | ||
Line 5: | Line 8: | ||
==Sources of Information== | ==Sources of Information== | ||
<references/> | <references/> | ||
* [https://en.wikipedia.org/wiki/South_Lancashire_Tramways Wikipedia] | |||
{{DEFAULTSORT: }} | {{DEFAULTSORT: }} | ||
[[Category: Town - ]] | [[Category: Town - St. Helens]] |
Revision as of 10:29, 9 December 2020
South Lancashire Tramways Co had difficulty raising capital and at the end of November 1900 its shares were acquired by the South Lancashire Electric Traction and Power Company. It also acquired the shares of the Lancashire Light Railways Co and the South Lancashire Electric Supply Co. Construction began in late 1901 and in October 1902 the first section from Lowton through Leigh and Atherton to Four Lane Ends at Over Hulton opened.
Atherton became the centre of the system and the tram sheds, power station and offices were built on the north side of Leigh Road at Howe Bridge (grid reference SD 6624 0203)