Chester Hydro-Electric Plant: Difference between revisions
No edit summary |
No edit summary |
||
Line 2: | Line 2: | ||
[[image:Im1913Eing-Chester.jpg|thumb| 1913. ]] | [[image:Im1913Eing-Chester.jpg|thumb| 1913. ]] | ||
[[image:JD Chester01.jpg|thumb|2016]] | [[image:JD Chester01.jpg|thumb|2016]] | ||
1912 The cost of coal increased significantly; Chester Corporation decided to instal a hydro-electric station on the River Dee. | |||
1913 Construction of hydro-electric plant on the River Dee; Mr R.(?) E. Britten engineer. | 1913 Construction of hydro-electric plant on the River Dee; Mr R.(?) E. Britten engineer. | ||
1923 the plant consisted of 1 × 185 kW and 2 × 225 kW hydro-electric machines. | |||
==See Also== | ==See Also== |
Latest revision as of 18:01, 12 January 2022



1912 The cost of coal increased significantly; Chester Corporation decided to instal a hydro-electric station on the River Dee.
1913 Construction of hydro-electric plant on the River Dee; Mr R.(?) E. Britten engineer.
1923 the plant consisted of 1 × 185 kW and 2 × 225 kW hydro-electric machines.