Engineers and Mechanics Encyclopedia 1839: Railways: Penryn Railway: Difference between revisions
New page: thumb The Penrhyn Railway is six miles and a quarter in length, divided into five stages. It has three-eighths of an inch fall in ... |
No edit summary |
||
Line 2: | Line 2: | ||
The [[Penrhyn Quarry Railway| Penrhyn Railway]] is six miles and a quarter in length, divided into five stages. It has three-eighths of an inch fall in a yard, with three inclines; was begun in October 1800, and finished in July 1801. The annexed sketch shows the kind of waggons that were used on this railway, twenty-four of which containing 24 tons, were drawn by two horses (one stage) six times a day; which is 144 tons per day, drawn 6.25 miles per day. This quantity of work was previously performed by 144 carts, and 400 horses; so that ten horses will by means of this railway do the work of four hundred! | The [[Penrhyn Quarry Railway| Penrhyn Railway]] is six miles and a quarter in length, divided into five stages. It has three-eighths of an inch fall in a yard, with three inclines; was begun in October 1800, and finished in July 1801. The annexed sketch shows the kind of waggons that were used on this railway, twenty-four of which containing 24 tons, were drawn by two horses (one stage) six times a day; which is 144 tons per day, drawn 6.25 miles per day. This quantity of work was previously performed by 144 carts, and 400 horses; so that ten horses will by means of this railway do the work of four hundred! | ||
== See Also == | |||
<what-links-here/> | |||
== Sources of Information == | == Sources of Information == | ||
<references/> | |||
{{DEFAULTSORT: }} |
Latest revision as of 10:33, 2 July 2022

The Penrhyn Railway is six miles and a quarter in length, divided into five stages. It has three-eighths of an inch fall in a yard, with three inclines; was begun in October 1800, and finished in July 1801. The annexed sketch shows the kind of waggons that were used on this railway, twenty-four of which containing 24 tons, were drawn by two horses (one stage) six times a day; which is 144 tons per day, drawn 6.25 miles per day. This quantity of work was previously performed by 144 carts, and 400 horses; so that ten horses will by means of this railway do the work of four hundred!
See Also
Sources of Information