Grace's Guide To British Industrial History

Registered UK Charity (No. 1154342)

Grace's Guide is the leading source of historical information on industry and manufacturing in Britain. This web publication contains 167,658 pages of information and 247,065 images on early companies, their products and the people who designed and built them.

Grace's Guide is the leading source of historical information on industry and manufacturing in Britain. This web publication contains 147,919 pages of information and 233,587 images on early companies, their products and the people who designed and built them.

Lynemouth Power Station: Difference between revisions

From Graces Guide
PaulF (talk | contribs)
No edit summary
PaulF (talk | contribs)
No edit summary
 
Line 1: Line 1:
Lynemouth was the first power station to start the process from burning coal to biomass in the UK, and is one of the largest such in Europe.
1968 Alcan had applied for planning permission for the construction of a new aluminium smelter in Northumberland at Lynemouth. Later that year, Alcan was granted the permission and site preparation would soon begin. To meet the electric demand of the new smelter, a power station would also be needed and therefore, Lynemouth Power Station was constructed  800 m (2,600 ft) from the aluminium smelter. Buildings designed by [[Yorke, Rosenberg and Mardall]] with engineering consultation from [[Engineering and Power Consultants]]. The power station was constructed by [[Tarmac Construction]] and the smelter by [[M. J. Gleeson Group|M. J. Gleeson Co]]. Both the power station and smelter were brought into operation in March 1972.
 
2018 Lynemouth converted from burning coal to biomass, one of the first in the UK, and is one of the largest such in Europe.


1968 Alcan had applied for planning permission for the construction of a new aluminium smelter in Northumberland at Lynemouth. Later that year, Alcan was granted the permission and site preparation would soon begin. To meet the electric demand of the new smelter, a power station would also be needed and therefore, Lynemouth Power Station was constructed  800 m (2,600 ft) from the aluminium smelter. Buildings designed by [[Yorke, Rosenberg and Mardall]] with engineering consultation from [[Engineering and Power Consultants]]. The power station was constructed by [[Tarmac Construction]] and the smelter by [[M. J. Gleeson Group|M. J. Gleeson Co]]. Both the power station and smelter were brought into operation in March 1972.


== See Also ==
== See Also ==

Latest revision as of 13:12, 30 April 2023

1968 Alcan had applied for planning permission for the construction of a new aluminium smelter in Northumberland at Lynemouth. Later that year, Alcan was granted the permission and site preparation would soon begin. To meet the electric demand of the new smelter, a power station would also be needed and therefore, Lynemouth Power Station was constructed 800 m (2,600 ft) from the aluminium smelter. Buildings designed by Yorke, Rosenberg and Mardall with engineering consultation from Engineering and Power Consultants. The power station was constructed by Tarmac Construction and the smelter by M. J. Gleeson Co. Both the power station and smelter were brought into operation in March 1972.

2018 Lynemouth converted from burning coal to biomass, one of the first in the UK, and is one of the largest such in Europe.


See Also

Sources of Information