Cork and Macroom Direct Railway: Difference between revisions
No edit summary |
|||
Line 1: | Line 1: | ||
of Capwell, Cork | of Capwell, Cork | ||
1861 The company was incorporated. Length 24.5 miles. | |||
1889 Consulting Engineer is [[James Price (1831-1895)| James Price]]. Loco Engineer is [[Charles Storer]].<ref>[[1889 Bradshaw's Railway Manual]]</ref> | |||
1908 The line is 24.5 miles in length. <ref>The Stock Exchange Year Book 1908</ref> | |||
Revision as of 10:34, 3 November 2023
of Capwell, Cork
1861 The company was incorporated. Length 24.5 miles.
1889 Consulting Engineer is James Price. Loco Engineer is Charles Storer.[1]
1908 The line is 24.5 miles in length. [2]
See Also
Sources of Information
- ↑ 1889 Bradshaw's Railway Manual
- ↑ The Stock Exchange Year Book 1908