Enniskillen, Bundoran and Sligo Railway: Difference between revisions
No edit summary |
|||
Line 1: | Line 1: | ||
1861 Incorporated | 1861 Incorporated. Length 35.75 miles. | ||
1868 Engineer is [[George W. Hemans]] <ref>[[1868 Bradshaw's Railway Manual]]</ref> | 1868 Engineer is [[George W. Hemans]] <ref>[[1868 Bradshaw's Railway Manual]]</ref> | ||
1889 Engineer is [[W. H. Mills]].<ref>[[1889 Bradshaw's Railway Manual]]</ref> | |||
== See Also == | == See Also == | ||
Line 10: | Line 12: | ||
{{DEFAULTSORT: }} | {{DEFAULTSORT: }} | ||
[[Category: Railway Companies | [[Category: Railway Companies]] |
Revision as of 11:25, 3 November 2023
1861 Incorporated. Length 35.75 miles.
1868 Engineer is George W. Hemans [1]
1889 Engineer is W. H. Mills.[2]