Deal and Dover Railway: Difference between revisions
No edit summary |
No edit summary |
||
Line 1: | Line 1: | ||
1865 Incorporated to build lines from the [[Chatham Railway]] to connect | 1865 Incorporated to build lines from the [[Chatham Railway]] to connect Deal and Walmer with Dover. Length 9.5 miles. | ||
1889 No progress made.<ref>[[1868 Bradshaw's Railway Manual]]</ref> | 1889 No progress made.<ref>[[1868 Bradshaw's Railway Manual]]</ref> |
Latest revision as of 10:40, 6 November 2023
1865 Incorporated to build lines from the Chatham Railway to connect Deal and Walmer with Dover. Length 9.5 miles.
1889 No progress made.[1]