Belfast and County Down Railway: Difference between revisions
No edit summary |
No edit summary |
||
Line 7: | Line 7: | ||
1868 Engineer is [[John Macneill]].<ref>1868 Bradshaw's Railway Manual</ref> | 1868 Engineer is [[John Macneill]].<ref>1868 Bradshaw's Railway Manual</ref> | ||
1881 Absorbed the [[Downpatrick, Dundrum and Newcastle Railway]] | |||
1884 Absorbed the [[Belfast, Holywood and Bangor Railway]] | 1884 Absorbed the [[Belfast, Holywood and Bangor Railway]] |
Latest revision as of 15:08, 10 July 2024


of Queens Quay, Belfast
1846 The company was incorporated.
1868 Engineer is John Macneill.[1]
1881 Absorbed the Downpatrick, Dundrum and Newcastle Railway
1884 Absorbed the Belfast, Holywood and Bangor Railway
1889 Engineer is George P. Culverwell.[2]
1908 The line is 80¼ miles in length. [3]
1926 Charles A. Moore retired as general manager at the end of September. Mr W. F. Minnis the traffic superintendent, became acting general manager.[4]
See Also
Sources of Information
- ↑ 1868 Bradshaw's Railway Manual
- ↑ 1889 Bradshaw's Railway Manual
- ↑ The Stock Exchange Year Book 1908
- ↑ The Engineer 1926/10/01