School of Ballooning: Eta: Difference between revisions
No edit summary |
No edit summary |
||
Line 16: | Line 16: | ||
{{DEFAULTSORT: }} | {{DEFAULTSORT: }} | ||
[[Category: Airships]] |
Latest revision as of 11:06, 28 January 2011
Note: This is a sub-section of School of Ballooning.
Maiden flight on 19th August 1913. It was a non-rigid of 118,000 cubic feet capacity. She was powered by two 80 hp water cooled Canton-Unne engines. Top speed was 42 mph with a crew of five.
She was handed over to the Royal Flying Corps on 20th September 1913.
She passed to Admiralty control on 1st January 1914 and on the 19th November she broke from her moorings whilst at Redhill and was not repaired.
See Also
Sources of Information
- The Royal Aircraft Factory by Paul R. Hare. ISBN 0-85177-843-7
- The Airship by Christopher Sprigg. Published c1931