Scarborough, Bridlington and West Riding Junction Railway: Difference between revisions
No edit summary |
No edit summary |
||
Line 1: | Line 1: | ||
of Metal Exchange Buildings, London | [[image:Im19550101PP-Bri.jpg|thumb| January 1955.]] | ||
of Metal Exchange Buildings, London. | |||
* 1885 The company was incorporated. | * 1885 The company was incorporated. |
Revision as of 12:47, 1 November 2011

of Metal Exchange Buildings, London.
- 1885 The company was incorporated.
- 1890 The line, 13.25 miles in length, was opened in December, and is to be worked in perpetuity by the North Eastern Railway.
- 1891 Certain portions of the line as originally contemplated were abandoned. [1]
Sources of Information
- ↑ The Stock Exchange Year Book 1908