Edward Bury and Co: Dreadnought: Difference between revisions
Created page with "It was a six-coupled engine with outside cylinders, which, after trials on the Liverpool and Manchester Railway, was finally scrapped in December of that year, entailing a dead l..." |
No edit summary |
||
Line 3: | Line 3: | ||
Railway, was finally scrapped in December of that year, | Railway, was finally scrapped in December of that year, | ||
entailing a dead loss to its builder of about £1500 between | entailing a dead loss to its builder of about £1500 between | ||
the cost of building and the price of the scrap. | the cost of building and the price of the scrap. <ref>The Engineer 1898/03/11</ref> |