Essendon and Upper Murray Railway: Difference between revisions
No edit summary |
No edit summary |
||
Line 5: | Line 5: | ||
Built in three sections: | Built in three sections: | ||
* Essendon to Seymour - Over the Great Divide. [[Joseph Brady]] was senior engineer | * Essendon to Seymour - Over the Great Divide. [[Joseph Brady]] was senior engineer | ||
* Seymour to Benella - Contractor was [[Murray and | * Seymour to Benella - Contractor was [[Murray and Styles]] | ||
* Benella to Wodonga - | * Benella to Wodonga - | ||
Revision as of 02:53, 25 January 2016
Built for Victorian Railways
1869 November 11th. Act authorising passed
Built in three sections:
- Essendon to Seymour - Over the Great Divide. Joseph Brady was senior engineer
- Seymour to Benella - Contractor was Murray and Styles
- Benella to Wodonga -