Grace's Guide To British Industrial History

Registered UK Charity (No. 1154342)

Grace's Guide is the leading source of historical information on industry and manufacturing in Britain. This web publication contains 167,711 pages of information and 247,104 images on early companies, their products and the people who designed and built them.

Grace's Guide is the leading source of historical information on industry and manufacturing in Britain. This web publication contains 147,919 pages of information and 233,587 images on early companies, their products and the people who designed and built them.

Cogload Junction Bridge: Difference between revisions

From Graces Guide
JohnD (talk | contribs)
No edit summary
JohnD (talk | contribs)
No edit summary
Line 5: Line 5:
near Taunton, Somerset
near Taunton, Somerset


An unusual steel truss girder bridge built in 1931. It is a flyover bridge taking the Bristol-Exeter line over the Taunton-Castle Cary line, avoiding the ealier rail crossing. The trusses are asymmetrical, an economical method of dealing with the considerable skew dictated by the need to have the flyover as close as practicable to the original route of the line.
An unusual steel truss girder bridge built in 1931. It is a flyover bridge taking the Bristol-Exeter line over the Taunton-Castle Cary line, avoiding the earlier rail crossing. The trusses are asymmetrical, an economical method of dealing with the considerable skew dictated by the need to have the flyover as close as practicable to the original route of the line.


The contractor for the junction alterations was [[Walter Scott and Middleton]] Ltd.
The contractor for the junction alterations was [[Walter Scott and Middleton]] Ltd.

Revision as of 11:52, 18 October 2016

2016

near Taunton, Somerset

An unusual steel truss girder bridge built in 1931. It is a flyover bridge taking the Bristol-Exeter line over the Taunton-Castle Cary line, avoiding the earlier rail crossing. The trusses are asymmetrical, an economical method of dealing with the considerable skew dictated by the need to have the flyover as close as practicable to the original route of the line.

The contractor for the junction alterations was Walter Scott and Middleton Ltd.

See Also

Loading...

Sources of Information