Falkiner and Tancred: Difference between revisions
No edit summary |
No edit summary |
||
Line 2: | Line 2: | ||
1878 They undertook a contract for the Lismore to Dungarvan section of the [[Waterford, Dungarvan and Lismore Railway]] and then the construction of the line connecting Oxford with Southampton through Didcot and Winchester. | 1878 They undertook a contract for the Lismore to Dungarvan section of the [[Waterford, Dungarvan and Lismore Railway]] and then the construction of the line connecting Oxford with Southampton through Didcot and Winchester. | ||
1886 Partnership dissolved | |||
Later they joined with others in [[Tancred, Arrol and Co]] | Later they joined with others in [[Tancred, Arrol and Co]] |
Latest revision as of 14:41, 9 November 2017
c.1878 On Mr. Hemans' retirement from the firm of Hemans, Falkiner and Tancred, Travers Hartley Falkiner formed a partnership with Mr Hemans' son-in-law, Sir Thomas Tancred.
1878 They undertook a contract for the Lismore to Dungarvan section of the Waterford, Dungarvan and Lismore Railway and then the construction of the line connecting Oxford with Southampton through Didcot and Winchester.
1886 Partnership dissolved
Later they joined with others in Tancred, Arrol and Co