GEC Large Machines Ltd. was a subsidiary of GEC (1982). Unclear how this relates to GEC Machines
1979 Extension to the existing gas furnace capacity became necessary.
1982 Company installed electric stress relieving furnaces.[1]
1989 Became GEC Alsthom Large Machines Ltd
1997 Became GEC Alsthom Large Electrical Machines Ltd
1998 Became Alstom Electrical Machines Ltd