GEC Large Machines Ltd. was a subsidiary of GEC (1982). Unclear how this relates to GEC Machines
1979 Extension to the existing gas furnace capacity became necessary.
1982 Company installed electric stress relieving furnaces.[1]
See Also
Sources of Information
- ↑ The Engineer 1982/03/11