Grace's Guide To British Industrial History

Registered UK Charity (No. 115342)

Grace's Guide is the leading source of historical information on industry and manufacturing in Britain. This web publication contains 162,259 pages of information and 244,500 images on early companies, their products and the people who designed and built them.

Grace's Guide is the leading source of historical information on industry and manufacturing in Britain. This web publication contains 147,919 pages of information and 233,587 images on early companies, their products and the people who designed and built them.

Moama and Deniliquin Railway Co

From Graces Guide
Revision as of 02:06, 29 January 2016 by Ait (talk | contribs) (Created page with "The Deniliquin and Moama Railway Company was a railway company formed by a syndicate of Victorian capitalists to construct a railway from Moama to Deniliquin in New South Wale...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)

The Deniliquin and Moama Railway Company was a railway company formed by a syndicate of Victorian capitalists to construct a railway from Moama to Deniliquin in New South Wales, Australia.

The rich Riverina district of New South Wales, which lies between the Murray and the Murrumbidgee Rivers, was handicapped in the middle of the 19th century by its distance from the seaboard. The Victorian Government sought to capture the trading potentialities of the area.

A broad gauge (1600 mm) railway was opened between Melbourne and Echuca in 1864. Echuca lies on the Murray River, the southern border of New South Wales. Consequently, pressure arose to have the line extended across the river, northward to Deniliquin. However, the New South Wales Government was adamant in its refusal to construct a railway which, to a large extent, would have only served Victorian interests.

In 1874 March the Government of New South Wales passed an Act which enabled the construction by a private syndicate of a 1600 mm gauge railway from Moama to Deniliquin. The line was 71 km (44 miles) long, connecting with the Victorian Railways line at the bridge over the Murray River, near Echuca.

Work commenced at Echuca where a junction was made with the Victorian northern railway. The initial crossing of the Murray was made over a temporary trestle bridge, 518m in length and built from red gum piles. As it was necessary to permit the passage of river craft, a lifting span was incorporated.

Clear of the Murray, the railway entered Moama. The country from Moama to Deniliquin comprises a series of almost level plains. The permanent way was laid on the surface and ballasted with sand. Throughout its length, there were only five curves of 1.6 km radius. The line was built within a period of 12 months.

On 4 July 1876, Moama celebrated the opening of the line with great gusto; a bullock being roasted and eaten in honour of the event. The Official gathering was held at Deniliquin where some 600 guests enjoyed the hospitality of the Directors of the company.

The only member of the NSW Legislature present at Deniliquin for the opening was the local Member for Murray, William Hay. Such was the disinterest by the NSW Government in providing a rail connection to the town that it was reputed to have quipped that "The New South Wales Government would as soon think of proposing to make a railway to the Moon as to Deniliquin". There remains no rail connection at Deniliquin with the NSW Railway system.

A contract was signed in September 1875 for an iron bridge to replace the temporary wooden one. A contemporary newspaper account highlights the terrors associated with the crossing of the original temporary bridge. "Frequently, passengers from Echuca would cross the river in a boat and board the train at Moama rather than risk what appeared to be a very perilous journey across the bridge. Passengers......state that the train appeared to crawl over the rickerty structure, which swayed and creaked as if it was going to collapse every minute and let the train.......drop into the swift-moving stream of the River Murray".

On 1 December 1923, under the terms of the 1922 Border Railways Act it was taken over by the New South Wales Government for transfer to the Victorian Railways. Since that date, it has been operated as part of the Victorian railways system.