Difference between revisions of "Switchgear Testing Co"
(Created page with " ==See Also== <what-links-here/> ==Sources of Information== <references/> {{DEFAULTSORT: }} Category: Town - ") |
|||
(8 intermediate revisions by 3 users not shown) | |||
Line 1: | Line 1: | ||
of Trafford Park, Manchester. | |||
Conducted switchgear-testing programme for the constituent firms (presumably part of [[AEI]]). | |||
1934 A sixteen-element electromagnetic oscillograph was made for the company by [[Metropolitan-Vickers]]. | |||
1934 The 3 switchgear manufacturing companies in the [[AEI]] group - [[BTH]], [[Ferguson Pailin]] and [[Metropolitan-Vickers|Metropolitan-Vickers Electrical Co]] were jointly erecting a high power testing plant to handle rupture tests on the largest types of switches<ref> The Times, Apr 13, 1934</ref>. It was initially equipped with a generator with a caapacity of 1500 MVA. The stator weighed 80 tons and was spring-mounted. 1200 HP were required to get the generator up to speed in 15 minutes, 300 HP for light running, and it took 30 minutes to run down.<ref>'B.T.H. Reminiscences - Sixty Years of Progress' compiled by H. A. Price-Hughes, BTH, 1946, p.75</ref> | |||
1961 Part of [[AEI]]<ref>The Times, Aug 31, 1961</ref> | |||
==See Also== | ==See Also== | ||
Line 7: | Line 17: | ||
{{DEFAULTSORT: }} | {{DEFAULTSORT: }} | ||
[[Category: Town - ]] | [[Category: Town - Trafford Park]] | ||
[[Category: Town - Manchester]] | |||
[[Category: Electrical Engineering - Heavy]] | |||
[[Category: Testing and Inspection Services]] |
Latest revision as of 11:07, 24 February 2020
of Trafford Park, Manchester.
Conducted switchgear-testing programme for the constituent firms (presumably part of AEI).
1934 A sixteen-element electromagnetic oscillograph was made for the company by Metropolitan-Vickers.
1934 The 3 switchgear manufacturing companies in the AEI group - BTH, Ferguson Pailin and Metropolitan-Vickers Electrical Co were jointly erecting a high power testing plant to handle rupture tests on the largest types of switches[1]. It was initially equipped with a generator with a caapacity of 1500 MVA. The stator weighed 80 tons and was spring-mounted. 1200 HP were required to get the generator up to speed in 15 minutes, 300 HP for light running, and it took 30 minutes to run down.[2]