Upper Sone Bridge
Double track railway bridge, which carries the East Indian Railway across the River Sone
Consists of 2 complete sets of girders carried on the same piers; one of these sets was manufactured by Dorman, Long and Co at Middlesbrough.
Engineers for the bridge were Rendel, Palmer and Tritton
1924-5 Opened to traffic