Stalybridge, Hyde, Mossley and Dukinfield Tramway and Electricity Board (SHMD) was a public transport and electricity supply company formed by Act of Parliament in August 1901. It was a joint venture between the borough councils of Stalybridge, Hyde, Mossley and Dukinfield. The system was officially opened on 21 May 1904.

At its inception the scheme included 21 route miles of tramway and a fleet of forty tramcars. The network was later extended to 27 route miles with a fleet of sixty tramcars. The rails were rolled by Bolckow, Vaughan and Co, Middlesbrough. The points and crossings were made by Hadfield's Steel Foundry Co, Sheffield. The main tram shed was on Park Road, Stalybridge adjacent to the Tame Valley Generating Station. Smaller tram sheds were also built in Hyde and Mossley.

British Westinghouse was the lead contractor for the first forty tram cars, supplying much of their electrical and mechanical equipment. The car bodies were sub contracted to the British Electric Car Co, Trafford Park, with bogies from the McGuire Manufacturing Co, Bury and wheel sets from the British Griffin Chilled Iron and Steel Co, Barrow in Furness.

The Tame Valley generating station consisted of three Yates and Thom, 815hp, vertical triple expansion steam engines. Each engine driving a Dick, Kerr and Co. 500kW, 60 pole alternator at 80rpm, giving a three-phase output of 6,000V at 40Hz.

The station's six Lancashire boilers were supplied by Tinker, Shenton and Co, of Hyde. Most of the electrical switchgear was supplied by Witting, Eborall and Co. Power from the station was distributed at 6,000V via specially made three core cables drawn through glazed earthenware underground conduits. Each of the four SHMD towns had its own substation consisting of two sychronous motor generators, each rated at 200kW, converting the 6,000V three-phase input into an output of 525V dc to feed the overhead tram wires and 460V (±230V) three-wire dc for lighting circuits.

The Tame Valley generating station remained in use until 1932, after which the building was used as a workshop and stores.

Norweb continued to use the former Tame Valley generating station building as a maintenance depot until 1984 after which it was sold to Beck and Pollitzer who continue to use it as a workshop.