The Engineer 1912/03/15: Difference between revisions
mNo edit summary |
No edit summary |
||
(One intermediate revision by one other user not shown) | |||
Line 1: | Line 1: | ||
[[Image:Pdf50.jpg|Pdf50.jpg]] | [[Image:Pdf50.jpg|Pdf50.jpg]] | ||
[[Media: | [[Media:Er19120315a.pdf| 1912 March 15th]] PDF | ||
'''Main Subjects | '''Main Subjects | ||
Line 28: | Line 28: | ||
* Prime Costing and Estimating | * Prime Costing and Estimating | ||
* Single-Phase vs. Continuous Current - [[H. M. Hobart]] | * Single-Phase vs. Continuous Current - [[Henry Metcalf Hobart|H. M. Hobart]] | ||
* Strikes and Lock-outs | * Strikes and Lock-outs |
Latest revision as of 15:05, 7 November 2014
1912 March 15th PDF
Main Subjects
- An Analysis of the Claims of the Marine Internal Combustion Engine
- Barclay, Curle and Co - Carson Smoke Box Door and Fastener
- Dorman, Long and Co - Electric Rolling Mills at Middlesbrough (Illustrated)
- Editorial
- Oil or Steam?
- How to Cheapen Transport
- The Coal Trade Situation
- The Navy Estimates
- Methods of Inviting Public Tenders
- Obituary
- On the Wider Adoption and Standardisation of Water-Tube Boilers - E. M. Speakman
- Prime Costing and Estimating
- Single-Phase vs. Continuous Current - H. M. Hobart
- Strikes and Lock-outs
- Twin-Screw Motor Ship Selandia (II) (Illustrated) - Burmeister and Wain
- Waves in Long Hydraulic Pipes and Tunnels - Robert H. Smith