1965 The Mechanical Design and Installation division of [[Tarmac]] had designed and constructed a new bitumen refinery for Philmac Oils<ref>The Times June 4, 1965</ref> | 1965 The Mechanical Design and Installation division of [[Tarmac]] had designed and constructed a new bitumen refinery for Philmac Oils<ref>The Times June 4, 1965</ref> | ||
1966 The bitumen refinery was expected to be on stream mid-year; [[Tarmac]] owned 50 percent of the refinery<ref>The Times May 24, 1966</ref> | 1966 The bitumen refinery at Eastham, Cheshire, was expected to be on stream mid-year; [[Tarmac]] owned 50 percent of the refinery<ref>The Times May 24, 1966</ref> | ||
Revision as of 17:55, 8 January 2023
1965 The Mechanical Design and Installation division of Tarmac had designed and constructed a new bitumen refinery for Philmac Oils[1]
1966 The bitumen refinery at Eastham, Cheshire, was expected to be on stream mid-year; Tarmac owned 50 percent of the refinery[2]