Ardrossan Railway: Difference between revisions
No edit summary |
|||
Line 18: | Line 18: | ||
{{DEFAULTSORT: }} | {{DEFAULTSORT: }} | ||
[[Category: Town - | [[Category: Town - Ardrossan]] | ||
[[Category: Railway Companies]] | [[Category: Railway Companies]] |
Latest revision as of 09:39, 19 February 2023
The Ardrossan Railway was a railway company in Scotland built in the mid 19th century that primarily ran services between Kilwinning and Ardrossan, as well as freight services to and from collieries between Kilwinning and Perceton. The line was later merged with the Glasgow and South Western Railway, and is today part of the Ayrshire Coast Line.
The line began life as a waggonway which opened in 1831 between Ardrossan and Kilwinning and was known as the Ardrossan and Johnstone Railway. It was initially built to the Scotch gauge of 4 ft 6 in and was worked by horses. For passenger services, a carriage held 24 passengers; 16 inside and 8 outside.
The railway was built by the Glasgow, Paisley and Johnstone Canal company. It commenced on the west side of Ardrossan harbour. It was intended to terminate at Johnstone, to connect with the Glasgow, Paisley and Johnstone Canal. This never occurred due to lack of money and therefore terminated at Kilwinning.
The 3 mile long Doura branch left the main line near Stevenston and crossed under the Glasgow, Paisley, Kilmarnock and Ayr Railway to reach the Doura coal pit. The 0.5 mile Fergus Hill branch left the Doura branch just after the Lugton Water crossing to reach the Fergus Hill coal pit.
In 1840 the line was re-gauged to standard gauge and connected with the Glasgow, Paisley, Kilmarnock and Ayr Railway at Kilwinning station; and in 1854 both lines merged with the new Glasgow and South Western Railway.
See Also
Sources of Information
- [1] Wikipedia