Tottenham and Forest Gate Junction Railway: Difference between revisions
No edit summary |
No edit summary |
||
Line 3: | Line 3: | ||
Just six miles long it ran from Tottenham to Woodgrange Park, joining the [[Tottenham and Hampstead Junction Railway]] at the South Tottenham and Stamford Hill station. | Just six miles long it ran from Tottenham to Woodgrange Park, joining the [[Tottenham and Hampstead Junction Railway]] at the South Tottenham and Stamford Hill station. | ||
1894 Opened to service<ref>The Engineer 1895/04/05</ref> | 1894 Opened to service<ref>[[The Engineer 1895/04/05]]</ref> | ||
1890 The company was incorporated. | 1890 The company was incorporated. |
Latest revision as of 06:39, 2 November 2023
of 41 Trinity Square, Tower Hill, London
Just six miles long it ran from Tottenham to Woodgrange Park, joining the Tottenham and Hampstead Junction Railway at the South Tottenham and Stamford Hill station.
1894 Opened to service[1]
1890 The company was incorporated.
1894 The line, 6 miles in length, was opened for traffic.
1908 The line is worked by the Midland Railway and the London, Tilbury and Southend Railway. [2]
1914 Absorbed by the Midland Railway. [3]
1923 Became part of London, Midland and Scottish Railway. [4]