Philmac Oils: Difference between revisions
No edit summary |
No edit summary |
||
Line 2: | Line 2: | ||
1966 The bitumen refinery at Eastham, Cheshire, was expected to be on stream mid-year; [[Tarmac]] owned 50 percent of the refinery<ref>The Times May 24, 1966</ref> | 1966 The bitumen refinery at Eastham, Cheshire, was expected to be on stream mid-year; [[Tarmac]] owned 50 percent of the refinery<ref>The Times May 24, 1966</ref> | ||
== See Also == | == See Also == | ||
<what-links-here/> | <what-links-here/> | ||
Line 11: | Line 9: | ||
{{DEFAULTSORT: }} | {{DEFAULTSORT: }} | ||
[[Category: Town - ]] | [[Category: Town - Ellesmere Port]] | ||
[[Category: Oil Products]] | [[Category: Oil Products]] |
Latest revision as of 10:19, 23 December 2024
1965 The Mechanical Design and Installation division of Tarmac had designed and constructed a new bitumen refinery for Philmac Oils[1]
1966 The bitumen refinery at Eastham, Cheshire, was expected to be on stream mid-year; Tarmac owned 50 percent of the refinery[2]