Stourport Electric Power Station: Difference between revisions
No edit summary |
No edit summary |
||
Line 8: | Line 8: | ||
1927 [[J. T. H. Legge]] was engineer.<ref>[[The Engineer 1927/06/17]]</ref> | 1927 [[J. T. H. Legge]] was engineer.<ref>[[The Engineer 1927/06/17]]</ref> | ||
1928 Selected for the [[Central England Electricity Scheme]]<ref>The Times Mar. 21, 1928</ref> | |||
Post-WWII Construction of Stourport 'B' station for the [[British Electricity Authority]] | Post-WWII Construction of Stourport 'B' station for the [[British Electricity Authority]] |
Revision as of 08:57, 16 January 2025




1923 Construction of the power station started for the Shropshire, Worcestershire and Staffordshire Electric Power Co; planned capacity was 12-15 MW.
1927 J. T. H. Legge was engineer.[1]
1928 Selected for the Central England Electricity Scheme[2]
Post-WWII Construction of Stourport 'B' station for the British Electricity Authority
1950 First generating set commissioned. [3]
1954 when commissioned the station's English Electric turbines had the most advanced steam conditions of any turbine in the UK's public supply system, at 1500 psi, 1050°F.
See Also
Sources of Information
- ↑ The Engineer 1927/06/17
- ↑ The Times Mar. 21, 1928
- ↑ The Engineer 1951/01/05
- The Engineer 1950/09/27