Hydraulic Power Co: Difference between revisions
No edit summary |
No edit summary |
||
Line 1: | Line 1: | ||
[[Image:Im1893EnV75-p54a.jpg|thumb| 1893. Deptford Station of the [[Hydraulic Power Co]].]] | [[Image:Im1893EnV75-p54a.jpg|thumb| 1893. Deptford Station of the [[Hydraulic Power Co]].]] | ||
presumably this is shorthand for the [[London Hydraulic Power Co]] | |||
1885 The mains of the Hydraulic Power Company were laid along the banks of the river (Thames) and were constantly | 1885 The mains of the Hydraulic Power Company were laid along the banks of the river (Thames) and were constantly |
Latest revision as of 08:33, 28 March 2025

presumably this is shorthand for the London Hydraulic Power Co
1885 The mains of the Hydraulic Power Company were laid along the banks of the river (Thames) and were constantly charged with water at a pressure of 700 lb. per inch.[1]
1893 Machinery for the Deptford Station supplied by the Hydraulic Engineering Co
See Also
Sources of Information
- ↑ The Engineer 1885/05/08