Chiswick Bridge

Designed by Sir Herbert Baker in collaboration with Mr. A. Dryland and Considere Construction Co Ltd. Constructed by the Cleveland Bridge and Engineering Co
It has a central span of 150 foot, side spans of 125 foot and two land spans of 61 foot 6 inches, to allow the possible construction of riverside roadways. The Bridge carries a 40 foot roadway (the A316) and two 15 foot pathways. It is faced entirely with Portland Stone. The cost was £208,284.00[1]
See Also
Sources of Information
- ↑ The Engineer1933/07/07.