Dungeness B Nuclear Power Station: Difference between revisions
No edit summary |
No edit summary |
||
Line 1: | Line 1: | ||
Dungeness B is an advanced gas-cooled reactor (AGR) power station consisting of two 615 MW reactors, which began operations in 1983 and 1985 respectively. | Dungeness B is an advanced gas-cooled reactor (AGR) power station consisting of two 615 MW reactors, which began operations in 1983 and 1985 respectively. Shared a site with [[Dungeness A Nuclear Power Station]] | ||
Dungeness B was the first commercial scale AGR power station to be constructed, the design being based on the much smaller Windscale AGR prototype; the WAGR. The £89 million contract was awarded in August 1965 to [[Atomic Power Constructions]] (APC), a consortium backed by [[Crompton Parkinson]], [[Fairey Engineering]], [[International Combustion]] and [[Richardsons, Westgarth and Co]]. | Dungeness B was the first commercial scale AGR power station to be constructed, the design being based on the much smaller Windscale AGR prototype; the WAGR. The £89 million contract was awarded in August 1965 to [[Atomic Power Constructions]] (APC), a consortium backed by [[Crompton Parkinson]], [[Fairey Engineering]], [[International Combustion]] and [[Richardsons, Westgarth and Co]]. |
Revision as of 10:00, 29 March 2016
Dungeness B is an advanced gas-cooled reactor (AGR) power station consisting of two 615 MW reactors, which began operations in 1983 and 1985 respectively. Shared a site with Dungeness A Nuclear Power Station
Dungeness B was the first commercial scale AGR power station to be constructed, the design being based on the much smaller Windscale AGR prototype; the WAGR. The £89 million contract was awarded in August 1965 to Atomic Power Constructions (APC), a consortium backed by Crompton Parkinson, Fairey Engineering, International Combustion and Richardsons, Westgarth and Co.
1969 Completion of the contract became the responsibility of the British Nuclear Design and Construction Co